TL;DR: To get a fast, accurate project quote from a security distributor, send everything in one request: the plans and relevant spec sections, an equipment schedule with device counts, cable footage, brand requirements and approved equals, the bid date, and when you’ll need material on site. Missing information is the most common reason a quote comes back late or comes back wrong.

A quote is only as good as what you send. A contractor who emails “need pricing on 40 cameras” will get a number. A contractor who sends the drawings, the spec section, and the bid date will get a number they can win with.


When should you ask for a project quote instead of counter pricing?

Counter pricing is what you pay when you walk in and buy what you need for a service call or a small job. A project quote is pricing built around a specific job, its quantities, and its timeline.

Ask for a project quote when any of these are true:

  • The job is going out to bid, and your material number has to hold until you know whether you won.
  • The quantities are large enough that buying them one counter trip at a time doesn’t make sense.
  • The spec names specific manufacturers or approved equals, and you need help confirming what qualifies.
  • The material crosses categories, such as fire, access control, video, and cable on the same job, and you want one number for all of it.
  • Delivery has to match a schedule, with material released as the job progresses.

The line between the two isn’t fixed, and it varies by distributor. If you’re not sure, ask your local franchise. A short conversation before you send anything beats a quote built on the wrong assumptions.

At Security Data Supply, project pricing is handled case by case, with no minimum job size. Many manufacturers require project registration or specific documentation before they approve special pricing, so contact your local franchise in person, by phone, or by email with the manufacturer, product list, quantities, and estimated purchase timeline. The franchise team coordinates the request with the manufacturer. All project pricing is subject to manufacturer review and approval, so a request doesn’t guarantee special pricing, and final pricing comes once the manufacturer approves it.


What should you include in a project quote request?

Send it all at once. Every item you leave out turns into a follow-up question, and every follow-up question adds a day.

What to send Why the distributor needs it
Drawings and the relevant spec sections Confirms device types, placement, and manufacturer requirements. Security scope usually sits in Division 28, with communications cabling in Division 27.
Equipment schedule or device counts Sets quantities. Include your own takeoff if you’ve done one, so the distributor can check it against the drawings.
Cable types and footage Cable is a large share of most low-voltage material costs. Include type, rating, conductor size, and estimated footage.
Brand requirements and approved equals Tells the distributor whether there’s room to quote alternates or if the spec is locked.
Bid date and your quote deadline Lets the distributor prioritize and tells them how long the pricing needs to hold.
Delivery timeline and phasing Determines whether material ships at once or releases in stages.
Job name, address, and your account information Ties the quote to your account and the right franchise.

If you only have part of the package, send what you have and say what’s missing. A distributor can work with an incomplete set if they know where the gaps are. What slows everything down is a partial set that looks complete.

One more tip: include your takeoff, even if it’s rough. It shows the distributor how you read the job, and a second set of eyes on device counts can catch a missed floor or a door hardware schedule you didn’t see.


How does a local franchise build your quote?

At a Security Data Supply franchise, the people who build your quote are part of a locally owned business in your market. That changes the process in a few practical ways:

  • You can talk to the person pricing the job. When a question comes up about a device count or an approved equal, the conversation happens with someone who knows the product lines and can call you directly, not through a ticket.
  • The quote covers more than one category. Security Data Supply franchises carry fire alarm, intrusion, video surveillance, access control, AV, networking, wire and cable, power, and tools. A job that crosses all of them can be priced in one place, which makes it easier to check that the pieces work together.
  • They can tell you about availability. A local team can tell you what’s in stock and what has a lead time, which matters for jobs on a tight schedule.

What a franchise won’t do is design the system for you. The counter team can help identify products, compatible accessories, and documentation, but system design, code compliance, and final equipment selection stay with the contractor. Read more about what locally owned means for contractors.


How do you ask for alternates and approved equals?

Tell the distributor up front whether the spec is closed, allows approved equals, or will need a substitution request after award. Many commercial specs name a basis-of-design product and allow approved equals. Quoting an alternate can lower your material cost or solve an availability problem, but only if it’s done in a way the engineer and owner will accept.

When you request a quote, say which of these applies:

  1. The spec is closed. Only the named product is allowed. Ask for pricing on that product only.
  2. The spec allows approved equals, and you want pricing on both the basis of design and an alternate. Ask for both, clearly labeled, so you can choose at bid time.
  3. You plan to submit a substitution request after award. Ask for the alternate’s data sheets and listing documentation so your submittal is ready.

Be specific about what the alternate has to match: listings, ratings, features, finish, and any compatibility requirements with other equipment on the job. A cheaper camera that doesn’t work with the specified access platform will cost more in the end.

Our post on substituting a spec’d product without losing the bid walks through how to build a substitution request the engineer will take seriously.


Can a distributor stage or hold material for a job?

It depends on the distributor and the franchise, so ask before you finalize the quote and get the answer in writing. On larger jobs, how material gets to the site matters as much as the price.

Questions to ask:

  • Can material be held after the purchase order until the job is ready for it?
  • Can it be released in phases to match rough-in, trim-out, and closeout?
  • How does will-call pickup work for a crew that needs part of the order on short notice?
  • What happens if quantities change after award?

At Security Data Supply, material holding, staged releases, and phased delivery are available case by case. They’re arranged directly with your local franchise and depend on the project, inventory availability, and the franchise’s storage capacity, so bring your material list, project timeline, and delivery schedule to the franchise early in the planning process.

Will-call matters most when something goes wrong. A crew that’s short a part mid-job needs to know who to call and how fast they can pick it up. Our post on why will-call pickup matters for security contractors covers why that relationship is worth setting up before the job starts.


What happens to the quote after you win the bid?

Winning the bid starts a second round of work on the material side. These steps keep it from slowing you down:

  1. Tell the distributor you won, and confirm the quote is still valid. Quotes typically have an expiration date, and pricing on some products can change.
  2. Reconcile the quote with the final drawings. Addenda and value engineering after bid often change counts or products. Update quantities before you issue a purchase order.
  3. Issue a purchase order that references the quote number, so pricing and terms carry over cleanly.
  4. Confirm submittal documents. Data sheets, listings, and installation manuals for every product on the job, ready for the engineer’s review.
  5. Set the delivery and release schedule with the franchise, including who on your team is authorized to pick up or receive material.
  6. Agree on how changes are handled, so a change order on the job doesn’t turn into a surprise invoice.

If you don’t have a wholesale account yet, open it before bid day, not after you win. Our post on opening a wholesale account with a security distributor explains what to bring. Pay-at-purchase and credit-terms accounts can involve different reviews, and you don’t want a credit decision holding up your first order.

Have a job going out to bid? Send the drawings and spec sections to your local SDS franchise team.

Find Your Local SDS


Frequently asked questions

How do I get a project quote from a security distributor?

Contact the distributor you plan to buy from and send everything in one request: drawings and spec sections, an equipment schedule or device counts, cable types and footage, brand requirements and approved equals, the bid date, and your delivery timeline. At Security Data Supply, start with your local franchise.

What information does a distributor need to quote a commercial security job?

At minimum, the distributor needs device types and quantities, cable types and footage, any manufacturer requirements from the spec, the bid date, and when material is needed on site. Drawings and the relevant spec sections, usually in Division 28 and Division 27, help the distributor confirm the scope.

Do I need a wholesale account before requesting a project quote?

Requirements vary by distributor. Some will quote before an account is open, but you’ll need an account in place before you can order. Open it before bid day so a credit review doesn’t delay your first purchase order.

Can a distributor quote approved equals or alternates?

Yes, if the spec allows them. Tell the distributor whether the spec is closed or allows approved equals, and ask for the basis-of-design product and the alternate priced separately, along with data sheets and listings for your submittal.

How long does a project quote take?

It depends on the size of the job, the number of product categories, and how complete the request is. Complete requests move faster because they don’t wait on follow-up questions. Ask your local distributor for their typical turnaround and send your request well ahead of the bid date.

What is the difference between counter pricing and project pricing?

Counter pricing applies to everyday purchases for service calls and small jobs. Project pricing is built around a specific job’s quantities, specifications, and timeline, and it’s usually set to hold through the bid period.


About the author

Ron Broussard is Chief Executive Officer of Security Data Supply and has more than 30 years of experience in the security industry. He has held executive leadership roles across distribution and manufacturing, giving him a broad perspective on the challenges contractors, integrators, and distributors face every day. At Security Data Supply, he guides the company’s franchise network, vendor relationships, and long-term growth strategy.

Methodology

This article reflects common project quoting practices in security, fire, and low-voltage distribution and the experience of Security Data Supply franchise teams. Quoting, staging, delivery, and account practices vary by distributor and franchise. Confirm the specifics with the Security Data Supply franchise you plan to buy from.